This project required extremely close cooperation with building occupants and extraordinary sensitivity to the whole museum collection. The ventilation system absorption steam chiller, four huge roof-mounted air handlers, and several thousand feet of 36″ diameter fabric duct hung throughout the museum. This work was featured in CAM Magazine.
LOCATION:
Dearborn, Michigan
PLAN:
Installation of AC and humidity systems for 11 acres of the museum
TEAM:
JC Beal Construction Inc.
The Edison Institute
Jickling Lyman Powell Associates
Peter Basso Associates, Inc.
PHOTOGRAPHY:
Stephen Graham Photography
RELATED LINKS:
Henry Ford Museum