 Canham Natatorium

Advancing an invaluable resource

This project corrected numerous deficiencies in the original design. An aggressive schedule required
JC Beal Construction to develop a "critical path" method using 15,000 square feet of staging platforms located 40 ft. above the pool deck to break the work down into eight overlapping components that were physically separated from one another. This "project within a project" method contributed to
JC Beal Construction winning a WCA Pyramid Award for Best Innovation
.

LOCATION:
Ann Arbor, Michigan

PLAN:
Infrastructure improvements including roof repair, new lighting,
air handling and humidity control,
pool lining, and water filteration

TEAM:
JC Beal Construction Inc.
U of M Plant Extension
Simpson Gumpertz & Heger, Inc.
McNamee, Porter and Seely, Inc.

PHOTOGRAPHY:
Stephen Graham Photography

AWARD:
2000 Pyramid Award - Best Innovation for staging methods and "project-within-a-project" scheduling

Back to Project Listings

Infrastructure improvements to the indoor swimming pool facilities.

Improvements to the pool lining and water filtration.

Roof repair and new lighting put in.